  • API 16A BOP Stripping Test, Replacement of Primary Control Console

    This fixture uses (3) 250 hp pumps and a servo valve to cycle a 14″ bore, 7″ rod, 86″ stroke hydraulic cylinder along a precise motion path to complete an API 16A BOP stripping test. The scope of work as well as pictures of the project are below. LABEL THE CONTROL CONSOLE I/O. Identify, trace, and label […]

  • API 16A BOP Stripping Test Fixture, Make Existing Fixture Operational

    This scope of work dealt with a a fixture built in the 1977-1983 timeframe and repaired in 1993 and 2003. The fixture uses (3) 250 hp pumps and a servo valve to cycle a 14″ bore, 7″ rod, 86″ stroke hydraulic cylinder along a precise motion path to complete an API 16A BOP stripping test. The fixture lost some […]

  • High Pressure Test Unit, Controls Overhaul

    This equipment was commissioned in the late 1990s with a significant amount of instrumentation. It transitioned in the last 10 years to being used as a standard motor-triplex pump. The controls program and panel were unnecessarily complex so an overhaul was done. The scope of work is below. Rewire the controls panel. Remove unnecessary wires between […]

Out-Market Your Competitors?

Get complete competitive insights on over 2.2 million companies to drive your marketing strategy.

Create Free Account Log in

Out-Market Your Competitors

Get complete competitive insights on over 2.2 million companies to drive your marketing strategy.

Create Free Account

Already a user?  Log in