  • Antigo Construction breaking for removal 10” thick, jointed reinforced concrete pavement (JRCP) on USH 380, Collin County, TX using two 8600 Badger Breakers®. The 8600s broke the concrete into 10” minus size particles using a 6” strike spacing. The broken concrete was loaded into off road dump truck and hauled away for recycling. 66,000 square yards of concrete was broken for removal in 6 days.

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Antigo Construction breaking for removal 13” of concrete made up of a 5” thick layer bonded over an 8" thick, continuously reinforced concrete pavement (CRCP) on I-280 near Davenport, IA using an 8600 Badger Breaker®. The 8600 broke the concrete free from the rebar by using a 6” to 8” strike spacing. The prime contractor raked through the broken concrete with a ripper tooth to bring the rebar to t...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Rubblization of 10" thick, jointed reinforced concrete pavement in preparation for a new asphalt overlay on I-70 in Fayette County, IL, performed by Antigo Construction using a MHB Badger Breaker®, Z-pattern grid roller, pneumatic-tire roller and a vibratory smooth drum roller in 2015. Traffic was maintained in adjacent lane as rubblization and asphalt overlay were performed in one lane at a time....

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Antigo Construction breaking for removal 9" thick, continuously reinforced concrete pavement (CRCP) on I-65 at Greenwood, IN using a MHB Badger Breaker®. The MHB broke the concrete free from the rebar by using a rubblization breaking pattern. The prime contractor raked through the broken concrete with a ripper tooth to bring the rebar to the surface. A hydraulic shear was then used to cut the reba...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Break & seat of jointed reinforced concrete pavement on Stagecoach Road (aka County Road 71), in Livingston County, NY, performed by Antigo Construction using a MHB Badger Breaker® in July, 2011. Killian Construction milled the existing asphalt overlay and windrowed the material on the shoulder. This was followed immediately by the break & seat process. Livingston County then spread the millings b...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Rubblization of 14” thick, non-reinforced, concrete pavement in preparation for an asphalt overlay on Runway 11/29 at Coles County Memorial Airport, IL, performed by Antigo Construction using T8600 and MHB Badger Breakers® and a grid roller in July, 2015. Howell Paving paved a 2” to 6” variable thickness asphalt base course to correct cross slope and a 2” thick asphalt surface course. 112,000 squa...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Modified rubblization – occasional spalling of 6” thick, non-reinforced, concrete pavement in preparation for an asphalt overlay on G42 and M16, in Pottawattamie County, IA, performed by Antigo Construction using a MHB Badger Breaker® and a grid roller in October, 2015. Western Engineering paved an average 5.5” thick aggregate interlayer to correct cross slope and a 3.5” thick asphalt overlay in 2...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Break and seat of 9” thick, mesh-reinforced, concrete pavement in preparation for an asphalt overlay on U.S. 60 (Owensboro Bypass), KY, performed by Antigo Construction using a MHB Badger Breaker® and a 50-ton proof roller in August, 2015. Yager Materials of Owensboro paved a 10” thick asphalt overlay in 3 lifts. The break and seat specification required 24” to 30” fragments visible at the surface...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Rubblization of 8" thick, mesh-reinforced, concrete pavement in preparation for an asphalt overlay on Milwaukee Street in Plymouth, WI, performed by Antigo Construction using a truck-mounted MHB Badger Breaker®, Z-pattern grid roller, pneumatic tire roller and smooth drum roller in 2014. “Modified rubblization – occasional spalling” was performed due to lower subgrade support. The operator varied ...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Breaking for removal a 14” thick, continuously reinforced concrete pavement holding pad at O’Hare International Airport in Chicago, IL, using two 8600 Badger Breakers®. The customer chose to have Antigo make two perpendicular passes of 8” hammer strike spacing and then 6” spacing in order to pulverize the concrete and leave the rebar completely debonded. The rebar was then raked out and loaded pri...

Antigo Construction, Inc.
Antigo Construction, Inc.
YouTube Video
  • Antigo Construction breaking for removal 6" to 12”thick, continuously reinforced concrete pavement (CRCP) at an industrial site in Warren, OH, using an 8600 Badger Breaker® during 2014. The 8600 broke the concrete thoroughly to allow the contractor to remove and process the reinforcing bars. This site is typical of industrial site reclamation projects with a wide variety of in-place pavements and...

Out-Market Your Competitors?

Get complete competitive insights on over 2.2 million companies to drive your marketing strategy.

Create Free Account Log in

By signing up, you agree to the Terms of Service and Privacy Policy.

Out-Market Your Competitors

Get complete competitive insights on over 2.2 million companies to drive your marketing strategy.

Create Free Account

Already a user?  Log in

By signing up, you agree to the Terms of Service and Privacy Policy.